| ARTICLE

Card Image

Operational Highlight: Seamless Coal Logistics Execution by PT AMA International

PT AMA International carried out a coal shipment from Batulicin, South Kalimantan to Cilegon, Banten, with a total sea transit of 10 days.

Upon arrival at Cilegon Port, the unloading process was conducted over three days. The barge was berthed at the port, and coal was transferred using heavy equipment into dump trucks as part of the standard unloading procedure.

The dump trucks then transported the coal to the stockpile area, where it was arranged according to operational requirements.

The overall process was completed in an orderly manner, with work safety and service quality maintained throughout the operation.

Such operations are part of PT AMA International’s routine work in ensuring smooth and consistent coal delivery.